The acceptance of the part shall be carried out at least 16 hours after the completion of the molding of the plastic part or the required post-treatment.
1. Inspection of product matching size
The matching dimensions of injection molding mold products refer to the matching dimensions between products or between injection moulding products and related components, including partial matching dimensions and overall relative position dimensions.
2. Trial assembly inspection
When the inspections of basic dimensions, external dimensions, and matching dimensions are completed and the design requirements are basically met, trial assembly inspection can be carried out. This is a very important means in product inspection. It can verify the matching dimensions and verify the space surface.
3. Injection molding quality inspection
When the pre-installation meets the requirements, the apparent quality of the part needs to be comprehensively inspected. At this time, the apparent quality refers to whether the apparent quality meets the requirements under the condition that there are no common defects.